Rock Tonnage Formula:
From: | To: |
The rock tonnage calculation determines the weight of rock needed for a project based on area dimensions and rock density. It's essential for landscaping, construction, and material ordering.
The calculator uses the rock tonnage formula:
Where:
Explanation: The formula converts all measurements to yards, calculates volume in cubic yards, then multiplies by density to get weight in tons.
Details: Proper calculation ensures you order the correct amount of material - preventing costly over-ordering or project delays from under-ordering.
Tips: Measure your project area carefully. Typical rock densities: crushed limestone (1.4), granite (1.6), basalt (1.7). Depth depends on application (2-4" for landscaping).
Q1: What's the difference between tons and cubic yards?
A: Cubic yards measure volume, tons measure weight. The conversion depends on material density.
Q2: How deep should rock be for landscaping?
A: Typically 2-4 inches for decorative rock, 4-6 inches for functional applications like drainage.
Q3: Why divide depth by 12 in the formula?
A: This converts inches to feet to maintain consistent units (all in feet before converting to yards).
Q4: How do I measure irregularly shaped areas?
A: Break into rectangular sections, calculate each separately, then sum the totals.
Q5: Should I order extra material?
A: It's common to add 5-10% to account for compaction, spillage, and measurement errors.