Cycle Time Formula:
From: | To: |
Cycle time is the average time between completion of successive units in a production process. It measures how fast a product is being made and is a key metric in manufacturing and operations management.
The calculator uses the cycle time formula:
Where:
Explanation: The formula calculates the average time required to produce one unit by dividing the total production time by the number of units produced.
Details: Cycle time is crucial for production planning, capacity analysis, bottleneck identification, and efficiency improvements in manufacturing processes.
Tips: Enter the total production time in minutes and the number of units produced. Both values must be positive numbers (units must be at least 1).
Q1: What's the difference between cycle time and takt time?
A: Cycle time measures actual production speed, while takt time is the required production speed to meet customer demand.
Q2: How can cycle time be reduced?
A: Through process improvements, eliminating waste, reducing setup times, and optimizing workflow.
Q3: What is a good cycle time?
A: This depends on your industry and product, but generally lower is better as long as quality is maintained.
Q4: Should downtime be included in production time?
A: For overall equipment effectiveness (OEE) calculations, yes. For theoretical cycle time, no.
Q5: How does batch size affect cycle time?
A: Larger batches typically have shorter cycle times per unit due to reduced setup time per unit.